ISRO Electrical Engineering (EE) 2014 - Question 41

All ISRO Electrical Engineering (EE) papers | ISRO Electrical Engineering (EE) 2014

In the loaded-frequency control system with tree governor action, the increase in load demand under steady condition is met,

  • A. only by decrease of load demand due to drop in system frequency
  • B. only by increased generation due to opening of steam valve
  • C. partly by increased generation and partly by decrease of load demand
  • D. partly by increased generation and partly by increased generator excitation

Answer: B. only by increased generation due to opening of steam valve

Explanation: Under steady conditions with free governor action, any frequency/speed drop actuates the governor to open the turbine steam/water valve, meeting the load demand entirely through increased generation.

| | All questions of ISRO Electrical Engineering (EE) 2014