ISRO Civil Engineering (CE) 2023 - Question 26

All ISRO Civil Engineering (CE) papers | ISRO Civil Engineering (CE) 2023

The general requirement as per BIS code 4926 for RMC is that concrete shall be discharged from the truck-mixer within ________ time of loading without using retarding admixtures.

  • A. 30 min
  • B. 60 min
  • C. 90 min
  • D. 120 min

| | All questions of ISRO Civil Engineering (CE) 2023