ISRO Mechanical & Aerospace 2023 - Question 57

All ISRO Mechanical & Aerospace papers | ISRO Mechanical & Aerospace 2023

Topic: Manufacturing

Which is the correct sequence of machining operations to be performed to finish a through hole of large diameter?

  • A. Drilling, reaming, boring
  • B. Drilling, boring, reaming
  • C. Boring, drilling, reaming
  • D. Boring, reaming, drilling

Answer: B. Drilling, boring, reaming

Explanation: The standard sequence to produce a large, precise hole is to first drill a pilot hole, then use a boring tool to enlarge it and align it accurately, and finally use a reamer to achieve the required dimensional accuracy and surface finish.

| | All questions of ISRO Mechanical & Aerospace 2023