GATE XE (Engineering Sciences) 2016 - Question 6

All GATE XE (Engineering Sciences) papers | GATE XE (Engineering Sciences) 2016

Section: General Aptitude | Type: NAT | Marks: 2

The following graph represents the installed capacity for cement production (in tonnes) and the actual production (in tonnes) of nine cement plants of a cement company. Capacity utilization of a plant is defined as ratio of actual production of cement to installed capacity. A plant with installed capacity of at least 200 tonnes is called a large plant and a plant with lesser capacity is called a small plant. The difference between total production of large plants and small plants, in tonnes is ____.

Figure for question 6, GATE XE (Engineering Sciences) 2016

Answer: 120.0

| | All questions of GATE XE (Engineering Sciences) 2016