Plant Use Factor is
- A. Maximum demand / Connected load
- B. Number of units generated / (Plant capacity × number of hours plant operated)
- C. Average demand / Plant capacity
- D. Average load / Maximum load
All ISRO Electrical Engineering (EE) papers | ISRO Electrical Engineering (EE) 2019
Plant Use Factor is
Previous question | Next question | All questions of ISRO Electrical Engineering (EE) 2019