ISRO Electrical Engineering (EE) 2017 - Question 54

All ISRO Electrical Engineering (EE) papers | ISRO Electrical Engineering (EE) 2017

Which of the following devices are required to measure three phase balanced power?

  • A. One watt meter
  • B. One watt meter and one voltage transformer of 1 : 1 ratio
  • C. One watt meter and two voltmeters
  • D. None of the above

Answer: A. One watt meter

Explanation: For a balanced 3-phase load, total power can be measured using a single wattmeter by connecting its current coil in one line and creating a star/artificial neutral connection (Ptotal = 3·W).

| | All questions of ISRO Electrical Engineering (EE) 2017