Which of the following is not a maturity level as per Capability Maturity Model?
- A. Initial
- B. Measurable
- C. Repeatable
- D. Optimized
Answer: B. Measurable
Explanation: CMM Levels: 1. Initial, 2. Repeatable, 3. Defined, 4. Managed, 5. Optimizing. 'Measurable' is not a standard level name.