GATE ME Casting: Previous Year Questions

GATE ME (Mechanical Engineering) Casting previous year questions from Production Engineering, with figures and the answer key.

Production Engineering | All GATE ME papers

GATE ME 2026, Question 42 (1 mark, MCQ)

Production Engineering - Casting

In relation to metal casting defects, match the following

GATE ME 2026 question 42

  1. P-III, Q-I, R-II
  2. P-II, Q-I, R-III
  3. P-II, Q-III, R-I
  4. P-III, Q-II, R-I

Answer: C

GATE ME 2026, Question 47 (2 marks, NAT)

Production Engineering - Casting

A metal has FCC crystal structure with of density and of atomic weight. The Avogadro's number is . The atomic radius of the metal is nm (rounded off to 2 decimal places).

GATE ME 2026 question 47

Answer: 0.1429

GATE ME 2025, Question 34 (1 mark, NAT)

Production Engineering - Casting

A liquid metal is poured in a mold cavity of size . The cooling is uniform in all directions with NO additional compensation for shrinkage. Considering the volumetric shrinkage during solidification and solid contraction as and , respectively, the length of the cube edge after cooling down to the room temperature is ___________ mm (rounded off to 1 decimal place).

GATE ME 2025 question 34

Answer: 189.8 to 190

GATE ME 2025, Question 38 (2 marks, MCQ)

Production Engineering - Casting

Match the mold elements in the casting process with the most suitable function

GATE ME 2025 question 38

  1. P-II, Q-IV, R-V, S-I, T-VI, U-III
  2. P-II, Q-V, R-VI, S-I, T-III, U-IV
  3. P-V, Q-I, R-VI, S-III, T-II, U-IV
  4. P-II, Q-IV, R-I, S-V, T-VI, U-III

Answer: A

GATE ME 2025, Question 62 (2 marks, NAT)

Production Engineering - Casting

Two metal parts (a cylinder and a cube) of same volume are cast under identical conditions. The diameter of the cylinder is equal to its height. The ratio of the solidification time of the cube to that of the cylinder is ___________ (rounded off to 2 decimal places). Assume that solidification time follows Chvorinov's rule with an exponent of 2 .

Answer: 0.83 to 0.87

GATE ME 2024, Question 31 (1 mark, MCQ)

Production Engineering - Casting

The allowance provided to a pattern for easy withdrawal from a sand mold is

  1. finishing allowance
  2. shrinkage allowance
  3. distortion allowance
  4. shake allowance

Answer: D

GATE ME 2024, Question 61 (2 marks, NAT)

Production Engineering - Casting

Aluminium is casted in a cube-shaped mold having dimensions as 20 mm × 20 mm × 20 mm. Another mold of the same mold material is used to cast a sphere of aluminium having a diameter of 20 mm. The pouring temperature for both cases is the same. The ratio of the solidification times of the cube-shaped mold to the spherical mold is _______ (answer in integer).

Answer: 1

GATE ME 2023, Question 25 (1 mark, MSQ)

Production Engineering - Casting

In a metal casting process to manufacture parts, both patterns and moulds provide shape by dictating where the material should or should not go. Which of the option(s) given correctly describe(s) the mould and the pattern?

  1. Mould walls indicate boundaries within which the molten part material is allowed, while pattern walls indicate boundaries of regions where mould material is not allowed.
  2. Moulds can be used to make patterns.
  3. Pattern walls indicate boundaries within which the molten part material is allowed, while mould walls indicate boundaries of regions where mould material is not allowed.
  4. Patterns can be used to make moulds.

Answer: A, B, D

GATE ME 2022 Set 2, Question 19 (1 mark, MCQ)

Production Engineering - Casting

Fluidity of a molten alloy during sand casting depends on its solidification range. The phase diagram of a hypothetical binary alloy of components A and B is shown in the figure with its eutectic composition and temperature. All the lines in this phase diagram, including the solidus and liquidus lines, are straight lines. If this binary alloy with 15 weight % of B is poured into a mould at a pouring temperature of 800 °C, then the solidification range is

GATE ME 2022 Set 2 question 19

  1. 400 °C
  2. 250 °C
  3. 800 °C
  4. 150 °C

Answer: D

GATE ME 2022 Set 2, Question 27 (1 mark, MSQ)

Production Engineering - Casting

Consider sand casting of a cube of edge length a. A cylindrical riser is placed at the top of the casting. Assume solidification time, t$_{s}$∝ V/A, where V is the volume and A is the total surface area dissipating heat. If the top of the riser is insulated, which of the following radius/radii of riser is/are acceptable?

Answer: A, B

GATE ME 2022 Set 2, Question 28 (1 mark, MSQ)

Production Engineering - Casting

Which of these processes involve(s) melting in metallic workpieces?

  1. Electrochemical machining
  2. Electric discharge machining
  3. Laser beam machining
  4. Electron beam machining

Answer: B, C, D

GATE ME 2021 Set 1, Question 46 (2 marks, NAT)

Production Engineering - Casting

Q.36 A true centrifugal casting operation needs to be performed horizontally to make copper tube sections with outer diameter of 250 mm and inner diameter of 230 mm. The value of acceleration due to gravity, g = 10 m/s2. If a G-factor (ratio of centrifugal force to weight) of 60 is used for casting the tube, the rotational speed required is rpm (round off to the nearest integer).

GATE ME 2021 Set 1 question 46

Answer: 660 to 664

GATE ME 2021 Set 2, Question 14 (1 mark, MCQ)

Production Engineering - Casting

Q.4 The Cast Iron which possesses all the carbon in the combined form as cementite is known as (A) Grey Cast Iron (B) Spheroidal Cast Iron (C) Malleable Cast Iron (D) White Cast Iron

GATE ME 2021 Set 2 question 14

Answer: D

GATE ME 2021 Set 2, Question 15 (1 mark, MCQ)

Production Engineering - Casting

Q.5 The size distribution of the powder particles used in Powder Metallurgy process can be determined by (A) Laser scattering (B) Laser reflection (C) Laser absorption (D) Laser penetration

GATE ME 2021 Set 2 question 15

Answer: A

GATE ME 2021 Set 2, Question 47 (2 marks, NAT)

Production Engineering - Casting

Q.37 Acastproductofaparticularmaterialhasdimensions75mmx125mmx20 mm.Thetotal solidification timeforthecastproduct isfound tobe 2.0 minutesascalculatedusingChvorinov'srulehaving theindex,n=2.Ifunder the identical casting conditions, the cast product shape is changed to a cylinder having diameter = 50 mm and height = 50 mm, the total solidification time will be minutes (round off to two decimal places).

GATE ME 2021 Set 2 question 47

Answer: 2.6 to 3

GATE ME 2020 Set 1, Question 21 (1 mark, MCQ)

Production Engineering - Casting

Q.No.11 Match thefollowing. Heat treatmentprocess Effect P:Tempering 1. Strengthening Q:Quenching 2. Toughening R:Annealing 3.Hardening S:Normalizing 4.Softening (A) P-2,Q-3,R-4,S-1 (B) P-1,Q-1,R-3,S-2 (C) P-3,Q-3,R-1,S-3 (D) P-4, Q-3, R-2, S-1 The base of a brass bracket needs rough grinding.For this purpose,the most

GATE ME 2020 Set 1 question 21

Answer: A

GATE ME 2020 Set 2, Question 21 (1 mark, MCQ)

Production Engineering - Casting

Q.No.11 INCORRECT? (A) It indicatesthetemperatureatwhichdifferent phasesstart tomelt (B) Relativeamountofdifferentphasescanbefoundundergivenequillibrium conditions (C) Itgivesinformationontransformationrates (D) Solidsolubilitylimits aredepicted byit

GATE ME 2020 Set 2 question 21

Answer: C

GATE ME 2020 Set 2, Question 52 (2 marks, NAT)

Production Engineering - Casting

Q.No.42 2Amouldcavityof 1200cm²volumehastobefilledthroughasprueof10cm lengthfeedingahorizontalrunner.Cross-sectional areaatthebaseofthesprueis 2 cm2. Consider acceleration due to gravity as 9.81 m/s².Neglectingfrictional losses due tomolten metal flow,the time taken to fill the mould cavity is seconds(roundoffto2decimalplaces). 3Acylindricalbarwith200mmdiameterisbeingturnedwithatoolhaving

GATE ME 2020 Set 2 question 52

Answer: 4 to 9

GATE ME 2019 Set 1, Question 23 (1 mark, MCQ)

Production Engineering - Casting

Q.13 In I a casting g process, a vertical channel through which molten metal flows downward from pouring basin to 1 for reaching the mold cavity runner is called (A) blister (B) sprue (C) riser (D) pin hole

GATE ME 2019 Set 1 question 23

Answer: B

GATE ME 2019 Set 1, Question 47 (2 marks, MCQ)

Production Engineering - Casting

Q.37 Match th Defect Cause P Blow hole 1 Poor collapsibility Q Misrun 2 Mold erosion R Hot tearing 3 Poor permeability S Wash 4 Insufficient fluidity (A) P-4, Q-3, R-1, S-2 (B) P-3, Q-4, R-2, S-1 (C) P-2, Q-4, R-1, S-3 (D) P-3, Q-4, R-1, S-2

GATE ME 2019 Set 1 question 47

Answer: D

GATE ME 2019 Set 2, Question 24 (1 mark, MCQ)

Production Engineering - Casting

Q.14 (A) the ability toharden when it is cold worked (B) the maximum hardness that can be obtained when it is austenitized and then quenched (C) the depth to which required hardening is obtained when it is austenitized and then quenched (D) the ability to retain its hardness when it is heated to elevated temperatures

GATE ME 2019 Set 2 question 24

Answer: C

GATE ME 2019 Set 2, Question 25 (1 mark, MCQ)

Production Engineering - Casting

Q.15 The fluidity of molten metal of cast alloys (without any addition of fluxes) increases with imcrease in A viscosity (B) surface tension (C) freezing range (D) degree of : superheat

GATE ME 2019 Set 2 question 25

Answer: D

GATE ME 2019 Set 2, Question 44 (2 marks, MCQ)

Production Engineering - Casting

Q.34 The binary phase diagram of metals P and Q is shown in the figure. An alloy X containing 60% P and 40%Q (by weight) is cooled from liquid to solid state.The fractions of solid and liquid (in weight percent) at 1250 °C, respectively, will be 1500 Liquidus Liquid X 1250 Solidus Temperature (° C) Solid 1000 100%P 203240 606880100%Q Concentration of Q (in weight %) (A) 77.8% and 22.2% (B) 22.2% and 77.8% (C) 68.0% and 32.0% (D) 32.0% and 68.0%

GATE ME 2019 Set 2 question 44

Answer: B

GATE ME 2019 Set 2, Question 60 (2 marks, NAT)

Production Engineering - Casting

Q.50 negligible. The acceleration due to gravity is 9.81 m/s2. The time (in s, round off to two decimal places) to fill up the mold cavity (of size 40 cm x 30 cm x 15 cm) is Atmospheric pressure Filling height 20 cm Diameter 2cm Open to atmosphere 15 cm Volume to be casted (mold cavity) 40 cm

GATE ME 2019 Set 2 question 60

Answer: 28.8 to 29

GATE ME 2018 Set 2, Question 22 (1 mark, MCQ)

Production Engineering - Casting

Q.12 Denoting L as liquid and M as solid in a phase-diagram with the subscripts representing different phases, a eutectoid reaction is described by (A) M  M  M 1 2 3 (B) L  M  M 1 1 2 (C) L  M  M 1 1 2 (D) M  M  M 1 2 3

GATE ME 2018 Set 2 question 22

Answer: A or D (either is accepted)

GATE ME 2018 Set 2, Question 23 (1 mark, MCQ)

Production Engineering - Casting

Q.13 During solidification of a pure molten metal, the grains in the casting near the mould wall are (A) coarse and randomly oriented (B) fine and randomly oriented (C) fine and ordered (D) coarse and ordered

GATE ME 2018 Set 2 question 23

Answer: B

GATE ME 2018 Set 2, Question 24 (1 mark, MCQ)

Production Engineering - Casting

Q.14 Match the following products with the suitable manufacturing process Product Manufacturing Process P Toothpaste tube 1 Centrifugal casting Q Metallic pipes 2 Blow moulding R Plastic bottles 3 Rolling S Threaded bolts 4 Impact extrusion (A) P-4, Q-3, R-1, S-2 (B) P-2, Q-1, R-3, S-4 (C) P-4, Q-1, R-2, S-3 (D) P-1, Q-3, R-4, S-2

GATE ME 2018 Set 2 question 24

Answer: C

GATE ME 2018 Set 2, Question 60 (2 marks, NAT)

Production Engineering - Casting

Q.50 For sand-casting a steel rectangular plate with dimensions 80 mm × 120 mm × 20 mm, a cylindrical riser has to be designed. The height of the riser is equal to its diameter. The total solidification time for the casting is 2 minutes. In Chvorinov’s law for the estimation of the total solidification time, exponent is to be taken as 2. For a solidification time of 3 minutes in the riser, the diameter (in mm) of the riser is __________ (correct to two decimal places).

GATE ME 2018 Set 2 question 60

Answer: 42 to 52

GATE ME 2017 Set 1, Question 34 (2 marks, NAT)

Production Engineering - Casting

A sprue in a sand mould has a top diameter of and height of The velocity of the molten metal at the entry of the sprue is Assume acceleration due to gravity as and neglect all losses. If the mould is well ventilated, the velocity (upto decimal points accuracy) of the molten metal at the bottom of the sprue is ______________________

GATE ME 2017 Set 1 question 34

Answer: 2.04 to 2.07

GATE ME 2017 Set 2, Question 22 (1 mark, NAT)

Production Engineering - Casting

Given the atomic weight of Fe is 56 and that of C is 12, the weight percentage of carbon in cementite (FeC)is

GATE ME 2017 Set 2 question 22

Answer: 6.3 to 7

GATE ME 2016 Set 1, Question 30 (1 mark, MCQ)

Production Engineering - Casting

Q.20 The “Jominy test” is used to find (A) Young’s modulus (B) hardenability (C) yield strength (D) thermal conductivity

GATE ME 2016 Set 1 question 30

Answer: B

GATE ME 2016 Set 1, Question 32 (1 mark, MCQ)

Production Engineering - Casting

The part of a gating system which regulates the rate of pouring of molten metal is

  1. pouring basin
  2. runner
  3. choke
  4. ingate

Answer: C

GATE ME 2016 Set 1, Question 59 (2 marks, NAT)

Production Engineering - Casting

Heat is removed from a molten metal of mass at a constant rate of till it is completely solidified. The cooling curve is shown in the figure. Assuming uniform temperature throughout the volume of the metal during solidification, the latent heat of fusion of the metal (in ) is ______________

GATE ME 2016 Set 1 question 59

Answer: 49.9 to 50.1

GATE ME 2016 Set 1, Question 61 (2 marks, MCQ)

Production Engineering - Casting

A cylindrical job with diameter of and height of is to be cast using modulus method of riser design. Assume that the bottom surface of cylindrical riser does not contribute as cooling surface. If the diameter of the riser is equal to its height, then the height of the riser (in ) is

GATE ME 2016 Set 1 question 61

Answer: A

GATE ME 2016 Set 2, Question 31 (1 mark, MCQ)

Production Engineering - Casting

Q.21 In the phase diagram shown in the figure, four samples of the same composition are heated to temperatures marked by a, b, c and d. At which temperature will a sample get solutionized the fastest? (A) a (B) b (C) c (D) d

GATE ME 2016 Set 2 question 31

Answer: C

GATE ME 2016 Set 2, Question 32 (1 mark, MCQ)

Production Engineering - Casting

The welding process which uses a blanket of fusible granular flux is

  1. Tungsten inert gas welding
  2. Submerged arc welding
  3. Electroslag welding
  4. Thermit welding

Answer: B

GATE ME 2016 Set 2, Question 58 (2 marks, MCQ)

Production Engineering - Casting

Q.48 In a binary system of A and B,a liquid of 20%A(80%B)is coexisting with a solid of 70%A (30%B).For an overall compositionhaving 40%A,thefraction of solid is (A)0.40 (B)0.50 (C)0.60 (D) 0.75

GATE ME 2016 Set 2 question 58

Answer: A

GATE ME 2016 Set 2, Question 59 (2 marks, NAT)

Production Engineering - Casting

Gray cast iron blocks of size with a central spherical cavity of diameter mm are sand cast. The shrinkage allowance for the pattern is . The ratio of the volume of the pattern to volume of the casting is ___________________

GATE ME 2016 Set 2 question 59

Answer: 1.08 to 1.1

GATE ME 2016 Set 3, Question 31 (1 mark, MCQ)

Production Engineering - Casting

Equal amounts of a liquid metal at the same temperature are poured into three moulds made of steel, copper and aluminum. The shape of the cavity is a cylinder with diameter. The size of the moulds are such that the outside temper-ature of the moulds do not increase appreciably beyond the atmospheric temperature during solidification. The sequence of solidification in the mould from the fastest to slowest is (Thermal conductivities of steel, copper and aluminum are and - respectively. Specific heats of steel, copper and aluminum are and - respectively. Densities of steel, copper and aluminum are and respectively.)

GATE ME 2016 Set 3 question 31

  1. Copper Steel Aluminium
  2. Aluminium Steel Copper
  3. Copper Aluminium Steel
  4. Steel Copper Aluminium

Answer: C

GATE ME 2015 Set 1, Question 46 (2 marks, MCQ)

Production Engineering - Casting

The solidification time of a casting is proportional to Where is the volume of the casting and is the total casting surface area losing heat. Two cubes of same material and size are cast using sand casting process. The top face of one of the cubes is completely insulated. The ratio of the solidification time for the cube with top face insulated to that of the other cube is

GATE ME 2015 Set 1 question 46

Answer: B

GATE ME 2015 Set 2, Question 58 (2 marks, NAT)

Production Engineering - Casting

A cube and a sphere made of cast iron (each of volume ) were cast under identical conditions. The time taken for solidifying the cube was The solidification time (in ) for the sphere is _____________________

GATE ME 2015 Set 2 question 58

Answer: 6 to 6.3

GATE ME 2015 Set 3, Question 17 (1 mark, MCQ)

Production Engineering - Casting

In full mould (cavity-less) casting process, the Pattern is made of

  1. Expanded polystyrene
  2. Wax
  3. Epoxy
  4. Plaster of Paris

Answer: A

GATE ME 2015 Set 3, Question 42 (2 marks, NAT)

Production Engineering - Casting

Ratio of solidification time of a cylindrical casting (height radius) to that of a cubic casting of side two times the height of cylindrical casting is ____________

GATE ME 2015 Set 3 question 42

Answer: 0.5 to 0.6

GATE ME 2015 Set 3, Question 60 (2 marks, NAT)

Production Engineering - Casting

The dimensions of a cylindrical side riser (height diameter) for a steel casting are to be determined. For the tabulated shape factor values given below, the diameter of the riser (in ) is _______________

GATE ME 2015 Set 3 question 60

Answer: 10.5 to 10.7

GATE ME 2014 Set 1, Question 34 (1 mark, MCQ)

Production Engineering - Casting

Q.24 The process of reheating the martensitic steel to reduce its brittleness without any significant loss in its hardness is (A) normalising (B) annealing (C) quenching (D) tempering

GATE ME 2014 Set 1 question 34

Answer: A

GATE ME 2014 Set 1, Question 65 (2 marks, NAT)

Production Engineering - Casting

An aluminium alloy (density ) casting is to be produced. A cylindrical hole of diameter and length is made in the casting using sand core (density ). The net buoyancy force (in Newton) acting on the core is _____________________

GATE ME 2014 Set 1 question 65

Answer: 7 to 8

GATE ME 2014 Set 3, Question 32 (1 mark, MCQ)

Production Engineering - Casting

Match the casting defects (Group A) with the probable causes (Group B):

GATE ME 2014 Set 3 question 32

Answer: B

GATE ME 2014 Set 3, Question 35 (1 mark, MCQ)

Production Engineering - Casting

The hot tearing in a metal casting is due to

  1. high fluidity
  2. high melt temperature
  3. Wide range of solidification temperature
  4. Low coefficient of thermal expansion

Answer: C

GATE ME 2014 Set 3, Question 62 (2 marks, MCQ)

Production Engineering - Casting

A cylindrical blind riser with diameter and height is placed on the top of the mold cavity of a closed type sand mold as shown in the figure. If the riser is of constant volume, then the rate of solidification in the riser is the least when the ratio is

GATE ME 2014 Set 3 question 62

Answer: A

GATE ME 2014 Set 4, Question 34 (1 mark, MCQ)

Production Engineering - Casting

Q.24 Match the heat treatment processes (Group A) and their associated effects on properties (Group B) of medium carbon steel Group A Group B P: Tempering I: Strengthening and grain refinement Q: Quenching II: Inducing toughness R: Annealing III: Hardening S: Normalizing IV: Softening ME04 (GATE 2014) (A) P-III, Q-IV, R-II, S-I (B) P-II, Q-III, R-IV, S-I (C) P-III, Q-II, R-IV, S-I (D) P-II, Q-III, R-I, S-IV

GATE ME 2014 Set 4 question 34

Answer: B

GATE ME 2014 Set 4, Question 63 (2 marks, NAT)

Production Engineering - Casting

A cylindrical riser of diameter and height has to be designed for a sand casting mould for producing a steel rectangular plate casting of dimensions having the total solidification time of minute. The total solidification time (in minute) of the riser is ___________________

GATE ME 2014 Set 4 question 63

Answer: 2.5 to 4.5

GATE ME 2013, Question 16 (1 mark, MCQ)

Production Engineering - Casting

A cube shaped casting solidifies in min. The solidification time in min for a cube of the same material, which is times heavier than the original casting, will be

GATE ME 2013 question 16

Answer: B

GATE ME 2011, Question 15 (1 mark, MCQ)

Production Engineering - Casting

Green sand mould indicates that

  1. Polymeric mould has been cured
  2. Mould has been totally dried
  3. Mould is green in colour
  4. Mould contains moisture

Answer: D

GATE ME 2011, Question 51 (2 marks, MCQ)

Production Engineering - Casting

A cubic casting of side undergoes volumetric solidification shrinkage and volumetric solid contraction of and respectively. No riser is used. Assume uniform cooling in all directions. The side of cube after solidification and contraction is

GATE ME 2011 question 51

Answer: A

GATE ME 2010, Question 52 (2 marks, MCQ)

Production Engineering - Casting

In a gating system, the ratio represents

GATE ME 2010 question 52

  1. Sprue base area runner area in-gate area
  2. Pouring basin area in-gate area runner area
  3. Sprue base area in-gate area casting area
  4. Runner area in-gate area casting area

Answer: A

GATE ME 2010, Question 53 (2 marks, MCQ)

Production Engineering - Casting

For the case of molding, it is decided to replace a spherical riser of diameter by a cylindrical riser. Determine size of the cylindrical riser that will have the identical solidification time. Assume blind risering & ratio of height to radius of cylinder is

GATE ME 2010 question 53

Answer: A

GATE ME 2009, Question 16 (1 mark, MCQ)

Production Engineering - Casting

Two streams of liquid metal, which are not hot enough to fuse properly, result into a casting defect known as

  1. Cold shut
  2. Swell
  3. Blow hole
  4. Scar

Answer: A

GATE ME 2009, Question 54 (2 marks, MCQ)

Production Engineering - Casting

Match the following

GATE ME 2009 question 54

Answer: D

GATE ME 2008, Question 55 (2 marks, MCQ)

Production Engineering - Casting

While cooling, a cubical casting of side undergoes and volume shrinkage during the liquid state, phase transition and solid state respectively. The volume of metal compensated from the riser is

GATE ME 2008 question 55

Answer: B

GATE ME 2007, Question 17 (1 mark, MCQ)

Production Engineering - Casting

Which of the following engineering materials is the most suitable candidate for hot chamber die casting

  1. Low carbon steel
  2. Titanium
  3. Copper
  4. tin

Answer: D

GATE ME 2007, Question 56 (2 marks, MCQ)

Production Engineering - Casting

If a particular - alloy contains less than % carbon, it is called

GATE ME 2007 question 56

  1. High speed steel
  2. Hypo-eutectoid steel
  3. Hyper eutectoid steel
  4. Cast irons

Answer: B

GATE ME 2007, Question 57 (2 marks, MCQ)

Production Engineering - Casting

Volume of a cube of a side and volume of sphere of radius are equal. Both the cube and the sphere are solid and same material. They are being cast. The ratio of the solidification time of the cube to the same of the sphere is

GATE ME 2007 question 57

Answer: D

GATE ME 2007, Question 58 (2 marks, MCQ)

Production Engineering - Casting

A long down sprue has an area of cross section of where the pouring basin meets the down sprue (i.e. at the beginning of the down sprue). A constant head of molten metal is maintaining by the pouring basin. The molten metal flow rate is considering the end of down sprue to be open to atmosphere and an acceleration due to gravity of the area of the down sprue in at its end (avoiding aspiration effects) should be

GATE ME 2007 question 58

Answer: C

GATE ME 2006, Question 18 (1 mark, MCQ)

Production Engineering - Casting

An expendable pattern is used in

  1. Slush casting
  2. Squeeze casting
  3. Centrifugal casting
  4. Investment casting

Answer: D

GATE ME 2006, Question 59 (2 marks, MCQ)

Production Engineering - Casting

In a sand casting operation, the total liquid head is maintained constant such that it is equal to the mould height. The time taken to fill the mould with a top gate is If the same mould is filed with a bottom gate, then the time taken is Ignore the time required to fill the runner and frictional effects. Assume atmospheric pressure at the top molten metal surfaces. The relation between the and is

GATE ME 2006 question 59

Answer: B

GATE ME 2005, Question 60 (2 marks, MCQ)

Production Engineering - Casting

A mould has a downsprue whose length is and the cross sectional area at the base of the down sprue is The down sprue feeds a horizontal runner leading into the mould cavity of volume The time required to fill the mould cavity will be

GATE ME 2005 question 60

  1. s
  2. s
  3. s
  4. s

Answer: B

GATE ME 2005, Question 61 (2 marks, MCQ)

Production Engineering - Casting

Match List - (products) with List - (casting process) and select the correct answer using the codes given below the lists

GATE ME 2005 question 61

Answer: D

GATE ME 2004, Question 19 (1 mark, MCQ)

Production Engineering - Casting

Misrun is a casting defect which occurs due to

  1. Very high pouring temperature of the metal
  2. Insufficient fluidity of the molten metal
  3. Absorption of gases by the liquid metal
  4. Improper alignment of the mould flasks

Answer: B

GATE ME 2004, Question 62 (2 marks, MCQ)

Production Engineering - Casting

Gray cast iron blocks are to be cast in sand moulds. Shrinkage allowance for pattern making is %. The ratio of the volume of pattern to that of the casting will be

GATE ME 2004 question 62

Answer: D

GATE ME 2003, Question 20 (1 mark, MCQ)

Production Engineering - Casting

Hardness of green sand mould increase with

  1. Increase in moisture content beyond percent
  2. Increase in permeability
  3. Decrease in permeability
  4. Increase in both moisture content and permeability

Answer: C

GATE ME 2003, Question 63 (2 marks, MCQ)

Production Engineering - Casting

With a solidification factor of the solidification time (in seconds) for a spherical casting of diameter is

GATE ME 2003 question 63

  1. None

Answer: B

GATE ME 2002, Question 21 (1 mark, MCQ)

Production Engineering - Casting

In centrifugal casting, the lighter impurities are

  1. Uniformly distributed
  2. Forced towards the outer surface
  3. Trapped near the mean radius of the casting
  4. Collected at the center of the casting

Answer: D

GATE ME 2002, Question 22 (1 mark, MCQ)

Production Engineering - Casting

The primary purpose of a sprue in a casting mold is to

  1. Feed the casting at a rate consistent with the rate of solidification
  2. Act as a reservoir for molten metal
  3. Feed molten metal from the pouring basin to the gate
  4. Help feed the casting until all solidification takes place

Answer: C

GATE ME 2001, Question 23 (1 mark, MCQ)

Production Engineering - Casting

Shrinkage allowance on pattern is provided to compensate for shrinkage when

  1. The temperature of liquid metal drops from pouring to freezing temperature
  2. The metal changes from liquid to solid state at freezing temperature
  3. The temperature of solid phase drops from freezing to room temperature
  4. The temperature of metal drops from pouring to room temperature

Answer: C

GATE ME 2000, Question 24 (1 mark, MCQ)

Production Engineering - Casting

Disposable patterns are made of

  1. Wood
  2. Rubber
  3. Metal
  4. Polystyrene

Answer: D

GATE ME 2000, Question 68 (4 marks, TEXT)

Production Engineering - Casting

Two castings, a cube and a slab of the same material solidify under identical conditions. The volumes of the castings are equal but the slab dimensions are in the ratio of , find the ratio of the solidification times of the cube to that of the slab.

GATE ME 2000 question 68

GATE ME 1999, Question 25 (1 mark, MCQ)

Production Engineering - Casting

Which of the following materials requires the largest shrinkage allowance, while making a pattern for casting?

  1. Aluminium
  2. Brass
  3. Cast Iron
  4. Plain Carbon Steel

Answer: B

GATE ME 1999, Question 72 (5 marks, TEXT)

Production Engineering - Casting

In a particular mold design, the down sprue has an area of Cross section of where the pouring basin leads into the sprue. The sprue is long. The required metal flow rate at the top section of the sprue is Determine the pouring height necessary above the sprue top. Also determine the area of of sprue at its bottom to avoid the aspiration of liquid molten metal.

GATE ME 1999 question 72

GATE ME 1998, Question 64 (2 marks, TEXT)

Production Engineering - Casting

Match the following

GATE ME 1998 question 64

GATE ME 1998, Question 69 (4 marks, TEXT)

Production Engineering - Casting

Two castings of the same metal have the same surface area one casting is in the form of a sphere and the other is a cube. What is the ratio of the solidification time for the sphere to that of cube.

GATE ME 1996, Question 26 (1 mark, MCQ)

Production Engineering - Casting

Light impurities in the molten metal are prevented from reaching the mold cavity by providing a

  1. Strainer
  2. Button well
  3. Skim bob
  4. All of the above

Answer: C

GATE ME 1996, Question 73 (5 marks, TEXT)

Production Engineering - Casting

The pouring basin in a sand mold is diameter height. The mould cavity is a cube of side and must be filled in seconds. The maximum velocity must ensure laminar flow into the mould cavity and in the gates of circular cross-section. Design the sprue to avoid aspiration effects. Assume (a) constant temperature, (b) no loss in the velocity head and (c) diameter of gate times diameter at the sprue base. Properties of the molten metal are per second, & - The diameter of sprue to avoid aspiration effect.

GATE ME 1996 question 73

GATE ME 1994, Question 65 (2 marks, TEXT)

Production Engineering - Casting

Only pairs can be matched :

GATE ME 1994 question 65

GATE ME 1993, Question 27 (1 mark, MSQ)

Production Engineering - Casting

Centrifugally casted products have

  1. Large grain structure with high porosity
  2. Fine grain structure with high density
  3. Fine grain structure with low density
  4. Segregation of slug towards the outer skin of the casting

Answer: B, C

GATE ME 1993, Question 74 (5 marks, TEXT)

Production Engineering - Casting

An aluminium cube of side has to be cast along with a cylindrical riser of height equal to its diameter. The riser is not insulated on any surface. If the volume shrinkage of aluminium during solidification is , calculate shrinkage volume of cube on solidification and minimum size of the riser so that it can provide the shrinkage volume.

GATE ME 1993 question 74

GATE ME 1992, Question 28 (1 mark, MCQ)

Production Engineering - Casting

In a green sand moulding process, uniform ramming leads to

  1. Less chance of gas porosity
  2. Uniform flow of molten metal into the mould cavity
  3. Greater dimensional stability of the casting
  4. Less sand expansion type of casting defect

Answer: C

GATE ME 1992, Question 66 (2 marks, TEXT)

Production Engineering - Casting

Match the following:

GATE ME 1992 question 66

GATE ME 1992, Question 70 (4 marks, TEXT)

Production Engineering - Casting

Calculate the ratio of the solidification times of two steel cylindrical risers of sizes diameter by in height and diameter by in height subjected to identical conditions of cooling

GATE ME 1992 question 70

GATE ME 1991, Question 29 (1 mark, MCQ)

Production Engineering - Casting

When there is no room temp change, the total shrinkage allowance on a pattern is INDEPENDENT OF

  1. Pouring temp of the liquid metal
  2. Freezing temp of the liquid metal
  3. The component size
  4. Coefficient of thermal contraction of solidified metal

Answer: A

GATE ME 1991, Question 30 (1 mark, MCQ)

Production Engineering - Casting

Converging passage is used for feeding the liquid molten metal into the mould to

  1. Increase the rate of feeding
  2. Quickly break off the protruding portion of the casting
  3. Decrease wastage of cast metal
  4. Avoid aspiration of air

Answer: D

GATE ME 1991, Question 75 (6 marks, TEXT)

Production Engineering - Casting

A falk consisting of a cope and drag has the following dimensions: length width and total septh (cope height ). A cast iron block is to be cast. If the specific weight of cast iron is and that of the mold sand , find lifting force on the cope created by buoyant force, weight of sand in the cope, the net force at the liquid-sand interface and additional weight to be kept on the cope.

GATE ME 1991 question 75

GATE ME 1990, Question 31 (1 mark, MCQ)

Production Engineering - Casting

The pressure at the in-gate will be maximum with the gating system

Answer: C

GATE ME 1989, Question 32 (1 mark, MCQ)

Production Engineering - Casting

Chills are used in molds to

  1. achieve directional solidification
  2. reduce possibility of blow holes
  3. reduce the freezing time
  4. smoothen the metal for reducing spatter.

Answer: A

GATE ME 1989, Question 33 (1 mark, MCQ)

Production Engineering - Casting

Increase in water content in moulding sand causes

  1. Flowability to go through a maxima
  2. Permeability to go through a maxima
  3. Compressive strength to go through a maxima
  4. strength to go through a maxima

Answer: A

GATE ME 1989, Question 67 (2 marks, MCQ)

Production Engineering - Casting

Two cubical castings of the same metal and sizes of side and side are moulded in green sand. If the smaller casting solidifies in the expected time of solidifications of larger casting will be

GATE ME 1989 question 67

  1. min
  2. min
  3. min

GATE ME 1988, Question 34 (1 mark, MCQ)

Production Engineering - Casting

The contraction allowance provided on the pattern and core boxes compensates for the following type of contraction.

  1. Liquid contraction
  2. Solidification contraction
  3. Solid contraction
  4. All the above three types of contractions.

Answer: C

GATE ME 1987, Question 35 (1 mark, MSQ)

Production Engineering - Casting

Riser is designed so as to

  1. Freeze after the casting freezes
  2. Freezing before the casting freezes
  3. Freeze at the same as the casting
  4. Minimize the time of pouring

Answer: A, C

GATE ME 1987, Question 71 (4 marks, TEXT)

Production Engineering - Casting

A down sprue of length has diameter of at its top end. The liquid metal in the pouring cup is main-tained upto height. What should be the theoretical diameter of down sprue at its lowest end to ensure that there is no aspiration effects.

GATE ME 1987 question 71